Exterior installations this month include window and curtainwalls, brick veneer, terracotta and metal paneling, drainage trench system, and curbing along Oak Street. Interior installations include continued framing and drywall throughout the new and existing building, ceramic and porcelain tile, ceiling grid and ceiling tile, millwork, and casework placements. Additionally, light fixtures, devices, and cover plates are being installed on the upper floors of the building, and primer coating and finish painting are ongoing.
Click here to see details of Lawrence Oliver for Oliver 2024
Click here to see November 2024 Timelapse video